Steps for designing an entire laboratory

321
发表时间:2021-05-05 15:11作者:Nanjing Huan Ding Engineering来源:China Laboratory Construction Center网址:http://www.labjianshe.com

Everyone knows that the laboratory is an overall planning. A laboratory is composed of infrastructure facilities, ventilation system engineering, electrical engineering, water supply and drainage engineering, centralized air system, laboratory furniture and supporting auxiliary equipment. So, today I will briefly introduce theLaboratory overall designA step of.


微信截图_20201107182108.png


Preliminary design of overall laboratory engineering:

1. Contact the customer to survey the site and gain a preliminary understanding of the site environment characteristics;
2. Understand the customer's ideas and requirements, digest and analyze them;
3. Collect relevant information in a targeted manner: including relevant instruments and equipment, laboratory operation procedures, etc.;
4. Determine the design style, plan the overall layout, and communicate with the customer again;
5. After the plan is finalized, the overall design will be carried out, including the drawing of color renderings, notes, text plans, project budget, etc.

Overall laboratory engineering construction plan:
1. Determine the overall design plan;
2. Investigate the details of the site to understand the customer's special requirements for material brands or other aspects;
3. Deepen the drawings: including design instructions, text plans, project budgets, floor plans, elevations, sections, color renderings, key parts drawings, water supply and drainage, electrical, HVAC and other details to meet the standards for construction according to the drawings;
4. After the plan is determined, a complete set of construction drawings will be output.